• Home
  • About
    • About
    • Contact
    • Donate
  • Local Issues
    • Highway 93 Corridor
    • Highway 93 - Past Updates
    • Steamboat Landing
    • Discovery Land LLC
    • Septage
    • Pedestrian Studies
  • Blog
  • More
    • Home
    • About
      • About
      • Contact
      • Donate
    • Local Issues
      • Highway 93 Corridor
      • Highway 93 - Past Updates
      • Steamboat Landing
      • Discovery Land LLC
      • Septage
      • Pedestrian Studies
    • Blog
  • Home
  • About
    • About
    • Contact
    • Donate
  • Local Issues
    • Highway 93 Corridor
    • Highway 93 - Past Updates
    • Steamboat Landing
    • Discovery Land LLC
    • Septage
    • Pedestrian Studies
  • Blog
Upper West Shore Alliance

Upper West Shore Alliance

Upper West Shore AllianceUpper West Shore Alliance

Community Meeting August 7th at 7pm

Our Programs

This meeting is co-hosted by Citizens for a Better Flathead, North Shore Water Alliance, and the Upper West Shore Alliance.

Unfortunately Commissioner Brodehl will be unable to make the meeting. 


MDT is working on scheduling, but has yet to confirm if anyone will be there. You are encouraged to reach out to your local MDT representatives at any time, with any questions.

 

District 1 - Missoula

District Administrator, Bob Vosen

2100 W Broadway
PO Box 7039
Missoula, MT 59807-7039
Phone: 406-523-5800 | Email
Toll-free: 888-231-5819
TTY: 800-335-7592
Fax: 406-523-5801


Kalispell Area Office

85 5th Avenue East North
PO Box 7308
Kalispell, MT 59903-0308
Phone: 406-751-2000
TTY: 800-335-7592
Fax: 406-752-5767


Transportation Commissioner

Kody Swartz
Email
Term expires: 1-2027

PDF Viewer

Bierney Creek Study 7/10/25

The UWSA requested this study in 2022. The data was collected in August of 2022. It is unknown why the results have taken so long to be shared. The Study was released in July of 2025 after the UWSA repeatedly requested the data.

Based on the results of the study, a Rapid Rectangular Flashing Beacon (RRFB) is warranted at the Bierney Creek Road crossing. However, ADA-compliant infrastructure is not currently in place to support it's installation. Bringing this intersection up t o compliance will require funding that competes with District-Wide needs. MTD is carefully assessing how to make the resources available. 


The UWSA sent a list of questions in response to this information on July 18th. As of this posting MDT has not acknowledged that email. 7/28/2025

Download PDF

Polson to Somers Corridor Study's Draft Report

The Polson to Somers Corridor Study's Draft Report is Available. Comments are still welcome through August 29, 2025.

  • MDT Link
  • Review the Corridor Study HERE
  • Review the Access Management Plan HERE

PDF Viewer

Adams Street Study 8/8/2023

The UWSA requested this study in 2022. The report was completed in August of 2023.

The study concluded that no further improvements are recommended at this time. Even if further improvements were justified, existing conditions prevent further pedestrian safety and intersection improvements without addressing the lack of pedestrian facilities, local access, and parking on the west side of US 93 and north of Bills Road.

Download PDF

Copyright © 2025 Upper West Shore Alliance - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept